Project

Lavra do Meio

Lavra do Meio, Sigma Lithium (TSX: SGML). Exploration lithium project in Minas Gerais, Brazil. 14 drill holes from published releases (2018 to 2021).

CompanySigma LithiumTSX: SGML
MineralslithiumExploration
Drill holes142018 to 2021

Explore in 3D

Free sign-in. A schematic model from published collars and assays, not a survey.

Latest published intervals

HoleIntervalReleased
DH-LDM-0222.7 m @ 1.34 % Li2O from 67.3 m6 Dec 2021
DH-LDM-0427.6 m @ 1.8 % Li2O from 38.8 m6 Dec 2021
DH-LDM-0838.5 m @ 1.3 % Li2O from 95.5 m6 Dec 2021
DH-LDM-1422.8 m @ 1.16 % Li2O from 149.7 m6 Dec 2021
DH-LDM-143.1 m @ 1.51 % Li2O from 178.3 m6 Dec 2021
DH-LDM-0370.5 m @ 0.68 % Li2O from 3.1 m16 Aug 2018
DH-LDM-0427.6 m @ 1.78 % Li2O from 38.8 m16 Aug 2018
DH-LDM-051.5 m @ 0.16 % Li2O from 91.9 m16 Aug 2018
DH-LDM-0531.9 m @ 1.31 % Li2O from 94.5 m16 Aug 2018
DH-LDM-0627.8 m @ 0.94 % Li2O from 91.7 m16 Aug 2018

As stated in the company's release, most recent first. Not a selection of the best results.

Latest Sigma Lithium releases

Other Sigma Lithium projects

Barreiro (Phase 2)Genipapo propertyGrota do Cirilo Lithium Project (Greentech Plant + Xuxa/Barreiro/Murial/Lavra do Meio/Nezinho do Chicao pegmatites)MaxixeMurial (Phase 3/4)Nezinho do Chicao (NDC, Phase 3)Santa Clara property (Elvira prospect)Sao Jose propertyTamborilXuxa (Phase 1 mine)

Schematic summaries from companies' published releases and public statistics. Positions and intervals are as published and may be approximate. Nothing here is investment advice; we show no share prices, ratings or rankings.