Project

Xuxa (Phase 1 mine)

Xuxa (Phase 1 mine), Sigma Lithium (TSX: SGML). Producing lithium project in Minas Gerais, Brazil. 16 drill holes from published releases (2018 to 2021).

CompanySigma LithiumTSX: SGML
MineralslithiumProducing
Drill holes162018 to 2021

Explore in 3D

Free sign-in. A schematic model from published collars and assays, not a survey.

Latest published intervals

HoleIntervalReleased
DH-XUX-0117.9 m @ 1.51 % Li2O from 21.8 m6 Dec 2021
DH-XUX-2315.3 m @ 1.96 % Li2O from 171.7 m6 Dec 2021
DH-XUX-2712.5 m @ 1.44 % Li2O from 172.3 m6 Dec 2021
DH-XUX-3311 m @ 1.44 % Li2O from 41.8 m6 Dec 2021
DH-XUX-554.6 m @ 2 % Li2O from 22.2 m6 Dec 2021
DH-XUX-6332.8 m @ 1.18 % Li2O from 136.6 m6 Dec 2021
DH-XUX-6319.3 m @ 1.85 % Li2O from 88.8 m6 Dec 2021
DH-XUX-7415.9 m @ 1.81 % Li2O from 162.1 m6 Dec 2021
DH-XUX-9113.6 m @ 1.51 % Li2O from 201 m6 Dec 2021
DH-XUX-7512.2 m @ 1.78 % Li2O from 170 m9 Oct 2018

As stated in the company's release, most recent first. Not a selection of the best results.

Latest Sigma Lithium releases

Other Sigma Lithium projects

Barreiro (Phase 2)Genipapo propertyGrota do Cirilo Lithium Project (Greentech Plant + Xuxa/Barreiro/Murial/Lavra do Meio/Nezinho do Chicao pegmatites)Lavra do MeioMaxixeMurial (Phase 3/4)Nezinho do Chicao (NDC, Phase 3)Santa Clara property (Elvira prospect)Sao Jose propertyTamboril

Schematic summaries from companies' published releases and public statistics. Positions and intervals are as published and may be approximate. Nothing here is investment advice; we show no share prices, ratings or rankings.