Project

Murial (Phase 3/4)

Murial (Phase 3/4), Sigma Lithium (TSX: SGML). Development lithium project in Minas Gerais, Brazil. 9 drill holes from published releases (2018 to 2021).

CompanySigma LithiumTSX: SGML
MineralslithiumDevelopment
Drill holes92018 to 2021

Explore in 3D

Free sign-in. A schematic model from published collars and assays, not a survey.

Latest published intervals

HoleIntervalReleased
DH-MUR-0134.4 m @ 1.21 % Li2O from 74.8 m6 Dec 2021
DH-MUR-0222.7 m @ 1.33 % Li2O from 64.2 m6 Dec 2021
DH-MUR-0637.6 m @ 1.2 % Li2O from 84.5 m6 Dec 2021
DH-MUR-1513.2 m @ 1.12 % Li2O from 67.1 m6 Dec 2021
DH-MUR-2323.8 m @ 1.25 % Li2O from 115.2 m6 Dec 2021
DH-MUR-3014.4 m @ 1.38 % Li2O from 178.3 m6 Dec 2021
DH-MUR-0122.2 m @ 1.01 % Li2O from 128 m9 Oct 2018
DH-MUR-0637.6 m @ 1.2 % Li2O from 84 m9 Oct 2018
DH-MUR-0939.6 m @ 1.06 % Li2O from 81 m9 Oct 2018
DH-MUR-1130.5 m @ 1.05 % Li2O from 157 m9 Oct 2018

As stated in the company's release, most recent first. Not a selection of the best results.

Latest Sigma Lithium releases

Other Sigma Lithium projects

Barreiro (Phase 2)Genipapo propertyGrota do Cirilo Lithium Project (Greentech Plant + Xuxa/Barreiro/Murial/Lavra do Meio/Nezinho do Chicao pegmatites)Lavra do MeioMaxixeNezinho do Chicao (NDC, Phase 3)Santa Clara property (Elvira prospect)Sao Jose propertyTamborilXuxa (Phase 1 mine)

Schematic summaries from companies' published releases and public statistics. Positions and intervals are as published and may be approximate. Nothing here is investment advice; we show no share prices, ratings or rankings.